Construction

Verify installation, startup, controls, and functional performance in the field.

Construction is where intent meets installation. The commissioning team observes work in progress, uses standardised checklists at installation and start-up, and witnesses functional performance testing under real operating conditions.

An issues and resolution log runs throughout, tracking every discrepancy until it is corrected or formally accepted by the owner. Problems found here are still the contractor’s to fix; the same problems found after handover become the owner’s.

Key focus

  • Plan & Coordinate Cx
  • Submittal Review & Test Prep
  • Site Observation & Pre-Checks
  • Functional Testing
  • Issues Management & Record
  • Turnover Preparation & Training

Roles

Owner / RepresentativeDefines project outcomes, approves requirements, and holds the team accountable for delivery.Project ManagerCoordinates commissioning scope, schedule, decisions, and communication across the project team.Commissioning ProviderPlans, leads, documents, and verifies the commissioning process from pre-design through occupancy.MEP DesignerDevelops the basis of design and incorporates testable commissioning requirements into the documents.Building OperatorBrings operational knowledge to reviews, training, acceptance, and long-term building performance.General ContractorCoordinates trade execution, startup, issue resolution, documentation, and test readiness.

Steps in this phase

1. Conduct the pre-bid commissioning workshoptbc2. Award construction contracts and appoint the construction phase CxP teamtbc3. Update the CxP team organisation chart, roles, responsibilities, and contact registertbc4. Coordinate owner's representative participationtbc5. Update the OPRtbc6. Update the Commissioning Plantbc7. Verify component startup and contractor pre-functional testingA practical commissioning workflow for verify component startup and contractor pre-functional testing.8. Witness factory acceptance testing (FAT) for critical equipmentA practical commissioning workflow for witness factory acceptance testing (fat) for critical equipment.9. Review construction submittals, shop drawings, and Sequence of Operations [SOO]tbc10. Conduct test & balance (TAB) verification and reviewA practical commissioning workflow for conduct test & balance (tab) verification and review.12. Develop test data records and reporting formstbc13. Verify operations and maintenance (O&M) documentationA practical commissioning workflow for verify operations and maintenance (o&m) documentation.14. Review draft Training Information, O&M and Systems Manual contenttbc15. Conduct site visits and installation verificationtbc16. Complete pre-functional checks, start-up, and readiness verificationtbc17. Execute Functional Performance Testing and manage the Issues and Resolution Logtbc18. Conduct Integrated Systems Testing [IST]tbc19.1. Develop, review, and finalize O&M documentation for HVAC&R systemstbc21. Issue and review the O&M training programme and materialstbc22. Deliver O&M training and verify its effectivenesstbc23. Verify updates to the BOD and OPRtbc24. Conduct the Construction Stage Commissioning Reviewtbc25. Issue the Construction Closeout Report and obtain Owner acceptancetbc